Pahtavaara Project (Au) – Mine Assessment and Ore Sorting Option, (Client – Rupert Resources Ltd.)  

Mine assessment and ore sorting option review and assessment for the Pahtavaara Gold Project, located in Northern Finland.

 

PL Project (Au) – Alternatives Tailings Assessment Report Preparation (Client – Minnova Corp)

Alternatives Tailings Assessment Report preparation for the reopening of the previously operational Puffy Lake (PL) mine in Northern Manitoba, Canada.

 

Detour Gold Project (Au) – Operations Review and Screen replacement Project (Client – Detour Gold)

Operations Review and Screen replacement Project for the Detour Gold Project located in Northern Ontario, Canada, including screen selections and options for improving screen capacities.

 

Ginguro Project (Au), Metallurgical Test Program, (Client – Mount Logan Resources Ltd.)

Metallurgical test program for Mount Logan’s Ginguro project – recipe, design, execution and Project Management.

 

Red Rabbit Project, Turkey (Au), Pre-Feasibility Study (Client – Ariana Resources plc.)

Pre-Feasibility study for the Red Rabbit Project, comprising the Kiziltepe and Tavşan sectors in Turkey. Process and Metallurgy review and design for a plant facility to process the feed from an open-pit mine.

 

Golden Ridge Project, Tanzania (Au), NI43-101 Report Audit, (Client – Barrick Gold Corporation)

Audit for the metallurgical testing and process design scope for a NI43-101 Technical report for the Golden Ridge Project located in Tanzania.

 

Gadag Project (Au), India, EPCM, (Client – Ramgad Minerals & Mining Pvt Ltd)

Processing plant engineering and procurement portion of the EPCM for the Gadag Gold Project in India.

 

North Mara Project, Tanzania (Au), NI43-101 Report Audit, (Client – Barrick Gold Corporation)

Audit for the metallurgical testing and process design scope for a NI43-101 Technical report for the North Mara Project located in Tanzania.

 

Goldfields Box Property Project (Au), Feasibility Study (Client – GLR Resources Ltd.)

Feasibility study for the Box Project – process and metallurgy portion including GEKKO process plant design.

 

Mt. Milligan Project (Au), Pre-feasibility Study (Client – Terrane Metals)

The Process and Metallurgy portion for the Feasibility Study, evaluating a design and economic viability of the Mt. Milligan Project located in north - central British Columbia, Canada. The Project is based on a conventional truck-shovel open pit mine and 60,000t/d copper flotation concentrator to be built over a 30-month period.

 

Lupin Plant Condition Assessment (Nunavut, Canada) – (Client – Wolfden Resources)

Site visit, review and evaluation of the condition of the Lupin Gold Plant equipment during the Care and Maintenance stage as part of the Wolfden’s plans to acquire the plant for it’s Izok Lake, High Lake, Ulu projects in Nunavut, Canada.

 

La Laguna Silver Project (Ag, Au), Feasibility Study (Client – Minera Orca S.A., Mexico)

Feasibility study for the La Laguna silver-gold tailings project in Zacatecas, Mexico with an estimated mineral reserve of 6,799,000 tonnes, containing an average of 57.92 grams/tonne silver, 0.31 grams/tonne gold and 328.92 grams/tonne mercury. Design of the processing facility.

 

La Crucita Gold Project (Au), Feasibility Study (Client – Vannessa Ventures Ltd.)    

Metallurgical testing and process design for Vannessa Ventures’ La Crucita Gold Project.

 

Casa Berardi Gold Project (Au), Feasibility Study (Client – Aurizon Mines Ltd.)

Metallurgical testing and process design for the Casa Berardi project, located 95km north of La Sarre, Quebec.

 

Bagama Gold Project (Au), Pre-feasibility Study (Client – New Gold, Mali)

Metallurgical testing and process design for a Pre-Feasibility study for the Bagama gold project, located on the southwest side of Mali, close to the Guinean border. The scope included evaluation of capital and operating costs for the process facility.